We understand that many areas statewide were impacted by the storm. Please call your utility company to report an outage.
Avista: 800-227-9187 | Pacific Power: 1-877-508-5088 | PSE: 1-888-225-5773
We understand that many areas statewide were impacted by the storm. Please call your utility company to report an outage.
Avista: 800-227-9187 | Pacific Power: 1-877-508-5088 | PSE: 1-888-225-5773
| Docket Number | PG-070590 |
|---|---|
| Advice | |
| Company | Puget Sound Energy |
| DBA | |
| Filing Type | Petition for Exemption |
| Industry (Code) | Gas Pipeline (015) |
| Status | Closed |
| Lead Staff | Jones, Al (UTC) |
| Filed Date | 03/13/2007 |
| Effective Date | N/A |
| Summary | Review proposed design and location for a 16-inch high pressure gas main in excess of 250 pounds per square inch.The proposed pipeline will extend from the Redmond Gate Station (227 NE Ave. and Union Hill Rd.) to the Redmond Limit Station (Avondale Way & Union Hill Rd.). The pipeline is scheduled to be installed in August 2007, to provide additional gas supply in the Redmond, Kirkland, and Bellevue areas. |