Filing TR - 200147
| Document Type |
Date |
Description |
| Other Order |
03/20/2020 |
Order 01, Granting Petition to Reconstruct a Public Highway-Rail Grade Crossing and Install and Intertie Between a Highway Signal and a Railroad Crossing Signal System at State Route 524 Near Maltby (USDOT: 091814T)
|
| Document |
03/12/2020 |
Corrected traffic signal preemption worksheet from WSDOT.
|
| MASTER SERVICE LIST |
03/03/2020 |
MASTER SERVICE LIST
|
| Initial Filing |
03/03/2020 |
Petition by Washington State Department of Transportation to reconstruct a railroad crossing and install an intertie between a highway signal and railroad crossing signal system at SR-524 near Maltby, on behalf of the Washington State Department of Transportation, from Connie Raezer. (via email)
|