UTC Case Docket Details
Docket Number 190654
| Docket Number | PG-190654 |
|---|---|
| Advice | |
| Company | Cascade Natural Gas Corporation |
| DBA | |
| Filing Type | Proximity Request |
| Industry (Code) | Gas Pipeline (015) |
| Status | Closed |
| Lead Staff | Cullom, David (UTC) |
| Filed Date | 07/31/2019 |
| Effective Date | N/A |
| Summary | Pursuant to the requirements of WAC 480-93-020 Proximity Considerations and 49 CFR Part 192 Sub Part K Uprating, Cascade Natural Gas Corporation (Cascade) requests to increase the pressure from 250 psig to 500 psig on the existing Southridge high-pressure pipeline within 100 feet of existing buildings or those that are under construction. Cascade is performing this work due to a necessary increase in capacity to residential customers in Richland and the addition of a new industrial customer. |
Event History
- 12/05/2019 -- Approved (Commissioner Rendahl moved to Issue an order granting Cascade Natural Gas Corporation’s (Cascade or company) request to increase the pressure from 250 pounds per square inch, gauge (psig) to 500 psig on the existing Southridge high-pressure pipeline which is within 100 feet of existing buildings or those that are under construction. Cascade is performing this work due to a necessary increase in capacity to residential customers in Richland and the addition of a new industrial customer. Commissioner Balasbas seconded the motion. The motion carried (3:0))
- 12/05/2019 --
- 12/05/2019 -- Open Meeting
- 08/07/2019 -- Pending
- 08/07/2019 -- Open