Customer Notice
For the latest information, resources, and guidance related to COVID-19, please visit our COVID-19 information page or visit our COVID-19 Utility Bill Assistance page.
For the latest information, resources, and guidance related to COVID-19, please visit our COVID-19 information page or visit our COVID-19 Utility Bill Assistance page.
Docket Number | PG-081033 |
---|---|
Advice | |
Company | Puget Sound Energy |
DBA | |
Filing Type | Petition for Exemption |
Industry (Code) | Gas Pipeline (015) |
Status | Closed |
Lead Staff | Jones, Al (UTC) |
Filed Date | 05/05/2008 |
Effective Date | N/A |
Summary | Petition for authorization under WAC 480-93-020, Proximity considerations. The proposed pipeline located in Pierce County extends from the existing Frederickson Gate Station near the intersection of 192nd Street East and Canyon Road East to a new Limit Station near 128th Street East and 30th Ave East (Waller Road East). The proposed high pressure pipeline will be approximately 5 miles in length, 16-inch diameter with a maximum allowable operating pressure of 500 pounds per square inch, gauge. |