NOTICE: The UTC office will be closed from 8 a.m. to noon on Wednesday, Nov. 6, 2024. The building will reopen to the public from noon to 5 p.m.

Sunshine Propane

2022

8445 Liquified Petroleum Gas (LPG) Standard Inspection, Port Ludlow

8510 Section 114, Headquarters

2021

8314 Liquified Petroleum Gas (LPG), Silverwater Cafe Meter System

2019

​7861 Liquified Petroleum Gas (LPG), Port Ludlow

7856 Liquified Petroleum Gas (LPG), Polk Street Complex

7857 Liquified Petroleum Gas (LPG), Tyler Street Complex

2018

Technical Assistance - Operator Training, Tyler Street Complex, (Insp. No. 7607)

  • Inspection Report

Technical Assistance - Operator Training, Port Ludlow, (Insp. No. 7606)

  • Inspection Report

Technical Assistance - Operator Training, Polk Street Complex, (Insp. No. 7605)

  • Inspection Report

2017

Technical Assistance - Operator Training, Sunshine Propane Headquarters, (Insp. No. 7604)

  • Inspection Report