Beware of Imposter Scams
The UTC does not collect funds or issue refunds on behalf of utility companies. If you think that you have been targeted by this scam, please contact your utility company immediately.
The UTC does not collect funds or issue refunds on behalf of utility companies. If you think that you have been targeted by this scam, please contact your utility company immediately.
Docket Number | PG-081033 |
---|---|
Advice | |
Company | Puget Sound Energy |
DBA | |
Filing Type | Petition for Exemption |
Industry (Code) | Gas Pipeline (015) |
Status | Closed |
Lead Staff | Jones, Al (UTC) |
Filed Date | 05/05/2008 |
Effective Date | N/A |
Summary | Petition for authorization under WAC 480-93-020, Proximity considerations. The proposed pipeline located in Pierce County extends from the existing Frederickson Gate Station near the intersection of 192nd Street East and Canyon Road East to a new Limit Station near 128th Street East and 30th Ave East (Waller Road East). The proposed high pressure pipeline will be approximately 5 miles in length, 16-inch diameter with a maximum allowable operating pressure of 500 pounds per square inch, gauge. |